# Setting up Venzeo™ for construction

> Projects per site, tags for progress and defects, and SMS requests to subcontractors, so builders keep proof of every stage of work.

Source: https://help.venzeo.com/en/article/setting-up-venzeo-for-construction
Language: en
Updated: 2026-10-10

A construction site changes every day, and most of that work is covered up a week later. Without dated photos per site, nobody can show what was built when, who reported a defect or whether the barriers stood in place.

## Make each construction site a project

Create a project for each site or contract, with your contract number as the custom ID. Set From and To dates for the contract, or mark the project as permanent. Your team attaches the project to every report, so the project's reports become the photo diary of that site. Projects can also arrive from your planning system through the Venzeo™ API. See [Grouping reports by project](https://help.venzeo.com/en/article/managing-projects).

_Example: before the ceiling is closed, the site manager photographs the pipes and wiring in each room and attaches the project of that building._

## Tag progress, defects, deliveries and safety

Let your team pick tags (previously called types) instead of typing notes. Useful categories are work stage, defect type and site safety, with tags such as `Progress`, `Defect`, `Delivery`, `Damaged material` and `Barrier missing`. The office then filters one site by defect or delivery. See [Adding and editing tags (types) for reports](https://help.venzeo.com/en/article/managing-types).

## Follow every defect until it is fixed

Use statuses for the snag list, for example `Open`, `Fixed` and `Checked`. The site manager sets `Fixed` when the subcontractor reports the repair, and `Checked` after the final inspection. The status history shows when each status was set. See [Tracking report progress with statuses](https://help.venzeo.com/en/article/status-management).

## Ask subcontractors for proof by SMS

Subcontractors often have no Venzeo™ account. Send them a Venzeo™ Request with photo steps, for example "Photograph the finished insulation" and "Photograph the cleaned work area". Their answer comes back as a certified report with a signature. See [Requesting photos from someone outside your team by SMS](https://help.venzeo.com/en/article/requesting-photos-by-sms).

## Which features to use

| Feature            | Use it?                 | How                                                        |
| ------------------ | ----------------------- | ---------------------------------------------------------- |
| Projects           | Yes                     | One per site or contract, contract number as custom ID     |
| Statuses           | Yes                     | Snag list from `Open` to `Checked`                         |
| Venzeo™ Request    | Yes                     | Proof of finished work from subcontractors without the app |
| Tasks              | Sometimes               | A repair for your own crew, with location and instructions |
| Email alerts       | Sometimes               | Missing barriers or damaged deliveries to the site manager |
| Assets             | When you track machines | Cranes, excavators or containers with a QR code            |
| Places of interest | Rarely                  | Only fixed places such as your depot or material yard      |

To show the client how the site is progressing, see [Sharing a live view of reports](https://help.venzeo.com/en/article/sharing-a-live-view-of-reports).