# Setting up Venzeo™ for greenery maintenance

> Projects per client contract, work-type tags and before-and-after photos, so landscaping and greenery companies can prove agreed quality.

Source: https://help.venzeo.com/en/article/setting-up-venzeo-for-greenery-maintenance
Language: en
Updated: 2026-10-10

Greenery and landscaping contracts promise a standard: mown, pruned, cleaned. Disputes are about whether the standard was met, and the value of the work only shows over a season. Photos with time and place, sorted by contract, answer both.

## Make each client contract a project

Create one project per client contract. Keep it permanent for a long-term contract, or set the contract period. Every mowing, pruning or inspection report then counts towards that client. See [Grouping reports by project](https://help.venzeo.com/en/article/managing-projects).

_Example: a landscaping company keeps one project per client contract, so all work for one client is in one place._

## Tag the work type and the site condition

Use one tag (previously called type) category for the work, such as mowing, hedge cutting, tree pruning, leaf removal or watering, and one for what the crew found, such as damage, litter or a fallen tree. Take one photo before and one after. See [Grouping tags into categories](https://help.venzeo.com/en/article/managing-type-categories).

## Use statuses to check quality

Let a manager review reports with statuses, for example `Done`, `Open`, `Needs management check` and `Rework`. See [Tracking report progress with statuses](https://help.venzeo.com/en/article/status-management).

## Give clients a link to their work

Filter by the client's project and send a public link. The client sees the certified photos without a Venzeo™ account. See [Sharing a live view of reports](https://help.venzeo.com/en/article/sharing-a-live-view-of-reports).

## Which features to use

| Feature            | Use it?                         | How                                  |
| ------------------ | ------------------------------- | ------------------------------------ |
| Projects           | Yes                             | One per client contract              |
| Places of interest | When sites repeat               | One per park, property or green area |
| Assets             | For valuable trees or equipment | One asset per tree, with a QR tag    |
| Tasks              | Sometimes                       | Seasonal jobs at a given place       |
| Statuses           | Yes                             | For quality review                   |
| Groups             | Sometimes                       | One group per team or contract       |

To track individual trees, see [Tracking assets such as bins and vehicles](https://help.venzeo.com/en/article/managing-assets).
